Special offer

Portland South Waterfront Condo Auction - Registration info -

By
Real Estate Agent with Portland Realty Hub LLC

Auction Day: Sunday, September 20th, 2009

Sunday, September 20th, 2009 at Marriott Portland Downtown Waterfront (listed by Accelerated Marketing Partners. The Excell Group, Inc.). This Auction begins at 4pm. Registered Bidders should arrive by 3pm to pick up bid packets.

Location:

Marriott Portland Downtown Waterfront

14101 SW Natio Parkway

Portland, Oregon 97201

Taking a Tour:

*Note* A Broker must be with you for your 1st visit in order for you to have representation during the auction. I have toured the condos and they are absolutely amazing. I would love to take you on a tour, answer questions, submit bids or explain the process. Taking a tour is a fast and fun experience. In order to have representation through out the Auction process, you’ll need to have your Broker go with you on the first visit. The Auction company will pay for this and it is highly recommended that you don’t go about this alone.

  1. Open Daily from 11:00am to 7:00pm
  2. Email to take a tour: soldbyaaron@gmail.com, or
  3. Call 503-332-9777

 

 

 

 

 

Located in Block 34 of the South Waterfront, the Atwater Place boasts 22 stories. A rectangle in shape, this building has 212 condos. Only five of these are townhomes. The sizes of units are from 1,100 sq ft to 3,700 sq ft. Almost every unit has views of the Willamette River and Mt Hood. Don’t forget about the 10,000 sq ft of retail space (all located on the ground floor). Gardens are incorporated with other green features like eco-roofs which has helped the Atwater PL condos receive a silver certification rating. The sustainable aspects of the building include: storm water management for run off, glazing on the building is for heating and cooling, low flow toilets, showers, and faucets, non toxic finishes, and a lot of recycled content. Designed by Thomas Hacker and GBD Architects. They used glass on the building’s face and has a raised courtyard and ground level plaza. This project started in December 2007 and was finished in 2007.