New Home: Construction Process

By
Real Estate Agent with London Properties

Buying new construction can be fun! Seeing your home built from the ground up are moments to cherish. Your camera will get lots of use during this period. There's approximately 47 steps---each step occurs so quickly, you won't even notice. Keep in mind, this is not a precise list. Just an additional tool for your toolbox. So, here are the steps to building a new home:

1. Plot map: Shows where your home sits on the lot

2. Chalk: A white chalk foundation is drawn to show where your home fits on the lot

3. Trench: the ground is excavated on the chalk line for footings, interior and exterior

4. Rimmed: Wood boards are staked for pouring of the cement foundation

5. Rough plumbing: sewer and waste pipes installed in the perimeter of foundation forms

6. Pouring prep: are inside the perimeter forms is prepared for the pouring of the cement foundation

7. Slab: The concrete foundation is poured

8. Snap & plate: A string with red chalk is placed where the walls are be placed.

9. Walls: wood studs are built for walls and bolted into place

10. Trusses: roof framing trusses are placed on top of the standing walls

11. Sheeting: Sheets of plywood are added

12. Frame pick up: checked for accuracy

13. Shear wall: sheets of plywood is nailed to some areas for reinforcement

14. Roof and shear: framing inspection

15. Windows: windows are put into place

16. Facia painted: this is the horizontal line along the rood perimeter

17. HVAC: heat/air ducting/fireplace goes in

18. Plumbing: plumbing is connected from foundation and aqua pec plumb lines are run

19. Tarp paper/Metal sheeting: moisture retardent sheets is installed before roof material is added

20. Roof: installed

21. Electric: technology (electric wiring, intercom, phone, surround sound) etc is completed

22. Mold: the wood studs are treated for mold

23. Lath: these are outside foam boards and wire mesh added to outside of your home

24. Insulation: insulation batts are installed on the exterior walls\

25. Drywall: installed

26. Tape: drywall is mud is added and taped

27. Texture: interior walls and ceilings have texture added

28. Stucco: exterior stucco

29. Masonry: if applicable brick or stone is added to exterior

30. Plumbing: inside show pan and inside plumbing connectors installed

31. Mill work: door casings, crown molding, baseboards and window sills. Exterior doors

32. Paint: your interior is painted

33. Cabinets installed

34. Flooring and countertops

35. Exterior stucco color coat

36. Cemented areas like sidewalks and driveway completed

37. Electric completed. Light switches, fixtures interior/exterior

38. Air conditioning units are installed

39. Sinks, toilets and plumbing fixtures installed

40. Shower and tub, mirrors, hardware etc

41. Rain gutters

42. Exterior paint/trim/shutters

43. Drywall/paint touch up

44. Carpet

45. Landscaping (drainage, sprinklers, sod/plants)

46. Likely another paint touch up

47. Final cleaning

 

Well, your new house is complete!

If you have questions on buying a new or existing home, I can help.

Happy home hunting!