The tile guy today finished up placing all the tile for the Master shower. Tomorrow he will grout the whole thing and be done with his part of the shower. The plumber will need to come in and switch out the lovely gold fixtures for even lovelier oiled bronze fixtures. He will also do the same for the Jacuzzi tube.
The grouting should take him about 4 hours tomorrow to complete. Then the shower glass guy comes in Monday to measure for the glass sides and door. It will take about a week to get these fabricated and then they will be installed.
I believe the same tile will replace the white tile still on the master bath floor, but that will not be done this year. This will require a few more homes to be sold. Anyone need a really motivated Realtor?
The drywall guy snuck in sometime today and went over all the already patched holes. Looks like he is about ready for final sanding and painting. Don't tell, but I found a few cracks in the drywall in other rooms that I am going to ask him to fix while he is here! No one from the kitchen company showed today. I suspect they will be back in Monday since the appliances were delayed till next Wednesday. Next: Floor sanding, sealing, wall painting, staircase fixing, carpet replacing. Fun, huh?
Comments(3)