$278,900 9912 PRONGHORN ROAD MCKINNEY, TX
MLS: 13349921 Type: Single Family County: Collin City: Mckinney Area: Frisco Neighborhood: Fossil Creek At Westridge #1 Zip: 75071 Style: Traditional Stories: 2 Taxes: $5,992
BETTER THAN NEW! 2014 Built LOADED with STYLISH Upgrades. This is THE ONE!No construction delay headaches.MOVE-IN READY!Just the perfect size with 3 Bedrooms,2.5 Bathrooms with framed mirrors and upgraded tile,LUXURIOUS WOOD FLOORS,Rich Kitchen cabinets with unbelievable space,GORGEOUS GRANITE,surround sound pre-wire,Massive Master Retreat for ultimate privacy,radiant barrier-lower utility bills,private backyard & more.Hurry,this one sparkles!
ELEMENTARY SCHOOL |
MIDDLE SCHOOL |
HIGH SCHOOL |
Judy Rucker Distance: 3.22 Miles |
Rogers Distance: 1.59 Miles |
Prosper Distance: 4.7 Miles |
PRICE HISTORY
4/2/2016 | Listed $283,500 |
4/11/2016 | 2% - $278,900 |
Association Fee Frequency | Annual |
Association Type | Mandatory |
Block | A |
Energy Saving Features | 12 inch+ Attic Insulation, 13-15 SEER AC, Ceiling Fans, Double Pane Windows, Energy Star Appliances, Gas Water Heater, Low E Windows, Programmable Thermostat, Radiant Barrier |
HOA Fee | 300 |
HOA Fee Includes | Full Use of Facilities, Maintenance of Common Areas, Management Fees |
Handicap Access | 0 |
Listing Area | FRISCO / DENTON COUNTY EAST AREA (55) |
Lot Number | 33 |
Other Equipment | Built-in Microwave, Cooktop - Gas, Dishwasher, Disposal, Plumbed For Gas in Kitchen, Vent Mechanism, Water Line to Refrigerator |
Property Type | Residential |
School District | Prosper ISD |
School Name | Judy Rucker |
Sub Area | FRISCO (1) |
Transaction Type | For Sale |
Type | RES-Single Family |
Year Built Details | Preowned |
INTERIOR FEATURES
Fireplace | Wood Burning |
Fireplaces Total | 1 |
Flooring | Carpet, Ceramic Tile, Wood |
Heating | Central Air-Elec, Central Heat-Gas |
Interior Features | Cable TV Available, Decorative Lighting, Flat Screen Wiring, High Speed Internet Available, Loft, Sound System Wiring, Window Coverings |
Number Of Dining Areas | 1 |
Number Of Living Areas | 1 |
Room Count | 0 |
Security System Yn | 1 |
Sq Ft Total | 2031 |
EXTERIOR FEATURES
Construction Materials | Brick |
Exterior | Covered Porch(es), Gutters, Patio Open, Sprinkler System |
Fencing | Wood |
Foundation Details | Slab |
Garage Depth | 20 |
Garage Width | 20 |
Lot | Interior Lot, Landscaped, Lrg. Backyard Grass, Some Trees, Subdivision |
Lot Area | Less Than .5 Acre (not Zero) |
Lot Size Area | 0.102 |
Lot Size Area (acres) | 0.102 |
Lot Size Area (sq Ft) | 4443 |
Lot Size Units | Acres |
Parking Features | Attached, Front, Garage, Garage Door Opener |
Parking Spaces Carport | 0 |
Parking Spaces Covered Total | 2 |
Parking Spaces Garage | 2 |
Pool | 0 |
Structural Style | Single Detached |
Style | Traditional |
Like us on Facebook: The Kimberly Davis Group
Fresh Listings! Just listed Mckinney Area! Don't miss out!
Want to know the value of your home? Click here: Find Your Homes Value Now For FREE.
Want to learn more information about a specific property? Click here: The Kimberly Davis Group-Looking to Buy or Sell… The Kimberly Davis Group is ranked #1!
Comments(0)