State Hwy. 6 between Bryan/College Station Texas and Hearne Texas has been undergoing some recent upgrades and repaving. The speed at which the contractors strip and repave a one mile lane of asphalt is absolutely phenominal, compared to just a few years ago. The giant stripping machines strips, and grinds the old highway surface which is then recycled.
It is really great that they are able to reuse these recycled material in these tough times. Asphalt is petroleum base.
Comments(4)