I stopped by the custom renovation at 1010 W 70th today after stopping by our renovation at 424 Dartmouth. While not much has taken place on the outside the inside of this house is slowly coming along.
The new door for the new half bath has been cut out of the wall in the living room. You may remember that the half bath is being moved from the left side of the kitchen to right. Moving the half bath allows the house to flow better and also makes more space in the kitchen.
They say the kitchen is the heart of the house and if that’s true than this kitchen is is having open heart surgery. Now that this space has been cleared out and several of the new floor boards have been installed you can really see how large this kitchen is going to be.
I’m going to use this picture as my reference point for the kitchen transformation. Can’t you just envision how the cabinets and counter tops will layout on this wall?
As you can see the master bathroom is still in its beginning stages. It’s always interesting to see a bathroom at this stage. Right now you can see right down stairs into the kitchen.
Were still several weeks away from this renovation being completed. We’re shooting for an April due date.