griffith road: October date set for Wind Generating Farm - 08/24/08 04:26 PM
A massive wind generating farm will be built in the Griffith area in Golden Valley just southwest of Kingman and not far from the Shinrump off ramp on the east side of I-40. Construction of the area’s first wind farm is set for October, planting 15, 200-foot turbines. The turbines have 125-foot blades. The 15 turbines are estimated to produce 15 megawatts of energy, enough to power 7,500 homes. The site is located approximately 1-1/2 miles east of the McConnico/Interstate 40 interchange.
The project is expected to benefit the local economy by an estimated $5-$10 million through local services like equipment … (6 comments)

 
Linda Mae Croom, (928) 768-3040

Linda Mae Croom

(928) 768-3040

Topock, AZ

More about me…

Mobile: (928) 444-0473

Please enjoy the music while reading my post....


Visit Blood Bought Opinions

Jesus said "no one who drinks the water I give will ever be thirsty again. The water I give is like a flowing fountain that gives eternal life."



Links

Archives

RSS 2.0 Feed for this blog