oyster point: The renovation scope of work was changed from the consultant's scope - 04/24/13 02:59 PM
What happens if the consultant visits the property and the entire scope of work isn't what was agreed to? What are the options? Yike's and Holy Crap as the father on "Everyone Likes Raymond" show used to say.
The consultant works with the borrower to determine a "scope of work" and that "scope of work" is what the appraisal is based on therefore it MUST be completed. Some time ago I got a call from NJ from a consultant who told me that he was called to perform Draw 1 on one of his projects with the contractor called him and … (0 comments)

 
Mike Young, FHA 203k Consultant 916-758-1809 (203kOnLine.com, covering the USA)

Mike Young

FHA 203k Consultant 916-758-1809

Stallings, NC

More about me…

203kOnLine.com, covering the USA

Address: Wherever you need us to be, Fairfield, CA office, Las Vegas, NV, 89122

Office: 916.758.1809

Mobile: 916.758.1809



Listings

Links

Archives

RSS 2.0 Feed for this blog