Are you thinking of installing a water well in Westborough, MA. This article is geared towards understanding Westborough MA Board of Health Regulations. Understanding your town regulations can be instrumental in compiling total project costs when it comes to drilling a water well in Westborough, MA.
1. Permit Info: Well construction permit fee: $200
2. Well Location: A plot plan is required when application is submitted. Guidelines include
(The following distances shall be the minimum allowed)
From |
Minimum Distance |
Leaching Field |
100ft |
Septic Tank |
75ft |
Cesspool |
100ft |
Sewer Lines |
50ft |
Driveway |
15ft |
Street or Highway |
25ft |
Buildings |
20ft |
3. Water Quality testing: Extensive water analysis is required. This test includes
Total Coliform Bacteria Sodium Hardness Arsenic (Total)
E-Coli Bacteria Alkalinity Nitrate Lead
Calcium Ammonia Nitrite Potassium
Copper Chloride pH Flouride
Iron Chlorine Sulfate Radon
Magnesium Color Turbidity Flouride
Manganese Conductivity Odor/Sediment P-dichlorobenzene
Radontetrachlorethylene Carbon Tetrachloride Trichloroethane Cis-1
Dichloroethylene Toluene Dichloroethylene Ethylbenzene
Monochlorobenzene
4. Water Quantity testing: A four hour flow test will be sufficient. The results must be greater than or equal to 5 gallons per minute for a four hour test.
5. Real Estate Transfer Requirements: As of now, Medway, MA does not have any real estate transfer requirements posted. However we strongly suggest getting the water quality and quantity tested to show you are getting a clean, safe, and usable well.
Wells on average in the Town of Westborough MA range from 300-400 in depth however it’s not uncommon for wells to run shallower or deeper hence why it’s called the average. The casing depth averages at 40 feet however deeper pockets of rock are possible.
If you have further questions contact the Westborough Board Of Health at 508-366-3045
Comments(0)