Special offer

LA METRO extensions for work, play

By
Mortgage and Lending with Jack Tenold LLC Jack Tenold NMLS 10261

LA METRO extensions for work, play

 

Traveling to popular areas like Miracle Mile, Beverly Hills, Century City, and Westwood will be easier! Commuting to work will only get better.  Angelenos and visitors will be able to get around faster, bypass the search and cost for parking, and you can play a role in mitigating congestion and pollutionpublic transportation is easy to use The next generation of children who learn how to use public transportation at an early age may never know how it used to be. 

 

PURPLE LINE extension 

9 miles of subway will be added on from Wilshire/Western going west over the next 19 years, with stops at these seven new locations:

  • Wilshire/La Brea
  • Wilshire/Fairfax
  • Wilshire/La Cienega
  • Wilshire/Rodeo
  • Century City
  • Westwood/UCLA
  • Westwood/Veterans Administration (VA) Hospital

 

Scheduled dates of operation:

Section 1

The stations below are scheduled to open in the year 2023:

  • Wilshire/La Brea
  • Wilshire/Fairfax
  • Wilshire/La Cienega

Here is a map of Section 1 of the Purple Line extension.

 Section 2

The stations below are scheduled to open in the year 2026:

  • Wilshire/Rodeo
  • Century City

 Section 3

The stations below are scheduled to open in the year 2035:

  • Westwood/UCLA
  • Westwood/Veterans Administration (VA) Hospital       

 

Construction

Construction started last year on Section 1 of the Purple Line Extension (Wilshire/La Brea, Wilshire/Fairfax, Wilshire/La Cienega) and will continue incrementally.

 

(Photo: Construction of Purple Line at Wilshire/La Brea)

See the Metro website for updates about construction on this project.

Here is a link to the complete map for all upcoming  additions to the Purple Line. It also shows the projected route of the Expo Line Light Rail additions. More details on the Expo Line below.

 

 

EXPO LIGHT RAIL extension 

Not only is the Purple Line being extended, so is the Expo Line. Look for seven more stations on that route  very soon.

Phase 1 has been completed and connects the bustling Downtown LA at the 7th Street Metro Station toLA Metro to ease automobile congestion Culver City. Phase 2 is under construction and will connect Culver City to the beach town of Santa Monica. 

 

Click here to see a detailed map of the extension of the Exposition Transit Corridor Phase 2, or Expo Line.

 

Scheduled dates of operation:

The stations below are in operation as of 2012:

  • 23rd Street
  • Jefferson/USC
  • Expo Park/USC
  • Expo/Vermont
  • Expo/Western
  • Expo/Crenshaw
  • Farmdale
  • Expo/La Brea
  • La Cienega/Jefferson
  • Culver City

(Ride time from Downtown LA to Culver City: 30 minutes)

Here is a map of the Expo Line Phase 1 route.

  •  Palms
  • Westwood/Rancho Park
  • Expo/Sepulveda
  • Expo/Bundy
  • 26th Street/Bergamot
  • 17th Street/SMC
  • Downtown Santa Monica

(Ride time from Downtown LA to Santa Monica: 46 minutes)

Here is a map of the Expo Line Phase 2 route

Along with the seven new Expo Line stations, there will also be 3 park-and-ride areas for metro passengers' convenience. For more information about the design elements, bikeway facilities and public art visit www.buildexpo.org.  To learn more about Metro in general, visit metro.net or call 323-GO-METRO

 

LA METRO extensions for work, play

Posted by
Jack Tenold NMLS 10261                                                       
      
You can reach me anytime at
     509-710-2227 no strings attached                             
 

Email:  Jack@JackTenold.com

Website: JackTenold.com

Refinance & Purchase  |   Reverse Mortgage Specialist 
Licensed to assist homeowners and home buyers in Washington
 
         Jack Tenold LLC Washington License No. MB-1819307  Office: 203 N Washington St Suite 200L Spokane, WA 99201      
 
                    Facebook Logo