Ocean City, Maryland: Replacement of Route 50 Drawbridge

By
Real Estate Agent with 410-935-5844 Office 634480

Ocean City, Maryland: Replacement of Route 50 Drawbridge

The Maryland Department of Transportation, State Highway Administration is in the planning phase of determining alternatives to the Route 50 Drawbridge, which brings people into Ocean City, Maryland.

There has been $2.5 million budgeted for the planning phase.  The initial alternatives of consideration were as follows:

Alternative 1: No Build
Alternative 2: Rehabilitation
Alternative 3: One Way Pair
Alternative 4: 1st Street Connection
Alternative 5: South Parallel Bridge
Alternative 5a: North Parallel Bridge
Alternative 6: 9th Street Connection
Alternative 7: Remove & Replace

Based on public input and an evaluation of impacts (residential, environmental, & socio-economic) associated with each proposed alternative, SHA recommended the retention of the alternatives presented below, and the regulatory agencies concurred.

Alternative 1: No Build
Alternative 2: Rehabilitation
Alternative 4 Modified: 1st Street Connection
Alternative 5: South Parallel Bridge
Alternative 5a: North Parallel Bridge

Funding for future phase does not currently exist and the eventual construction may be 20 years away.

Virtual tour of the preferred alternative and more information

Brian Bedford
Zenith Realty - Catonsville, MD

Ron,

Thank you for the information.  It does take quite a while to plan for these big projects.

Aug 20, 2010 06:42 AM
Kristi Allison
Bel Air, MD

Ron,

Thank you for posting.  Amazing how much money it costs just for the study phase.

Aug 20, 2010 07:37 AM
Kathryn Sparks
Zenith Realty - Baltimore, MD

Ron,

I like the idea of the virtual tour, although it seemed a bit incomplete.

Aug 21, 2010 07:49 AM
Veronica Krzinska
Zenith Realty - Rosedale, MD

Ron,

I guess it is tough for a location like this for them to think about mass transit alternatives.

Aug 22, 2010 06:42 AM
Alexandra "Sandy" Pzkowski
Zenith Realty - Baltimore, MD

Ron,

Twenty years away?  I better start to make some new travel plans.

Aug 22, 2010 06:52 AM
Karen Krzniak
Zenith Realty - Towson, MD

Ron,

When these projects take such a long time, it is critical that they get it right.

Oct 05, 2010 06:15 AM
Karen Krzniak
Zenith Realty - Towson, MD

Ron,

Should contractors start bidding on the construction jobs now or should they wait?

Oct 06, 2010 05:32 AM